Power & Telecom

We can design the civil and structural engineering aspect of the transmission lines required to reach remote/rural areas.

power-1549122_1920
previous arrow
next arrow

Power in Nigeria is a major challenge; generation, transmission, and distribution. The current distribution network covers principally the older cities and urban areas.

The rural electricity board which used to cater for rural areas has become extinct thereby necessitating the extension of the National grid into these areas to among other things steam rural-urban migration and its attendant problems.

The telecommunications industry has done much better in reaching out to the rural areas but there is still room for improvement. We can design the civil and structural engineering aspect of the transmission lines required to reach remote/rural areas as we have demonstrated in the telecoms industry in Nigeria and overseas.

Did you know?

DELTEC is among the first engineering companies in Nigeria to design, fabricate, galvanize and install telecom towers in Nigeria when GSM operations started in 2001.

Our services

Design, Fabrication, and installation

Feasibility studies

Route analysis and selection

Ready to Discuss your Project?

Scroll to Top
404 Not Found

404

Not Found

The resource requested could not be found on this server!


Proudly powered by LiteSpeed Web Server

Please be advised that LiteSpeed Technologies Inc. is not a web hosting company and, as such, has no control over content found on this site.